Q-26-0155 Sent
NWS seawater exchanger — Cu-Ni retube, 3 off · Woodside Energy · valid until 12 Sep 2026
Accepting this quotation opens a job on the next JN number and carries the
778.0 h manufacturing and 99.0 h testing straight
across as the quoted hours. Nothing is re-keyed and nothing is re-estimated.
britannia:jahco
engineered for safety · built for pressure
Britannia Jahco Australia Pty Ltd
18 Healey Road, Dandenong South VIC 3175
ABN 13 141 068 171 · +61 3 9580 5599
ISO 9001 · LRQA
18 Healey Road, Dandenong South VIC 3175
ABN 13 141 068 171 · +61 3 9580 5599
ISO 9001 · LRQA
QUOTATION
Q-26-0155
Issued 29 Jul 2026
Valid until 12 Sep 2026
Estimator Andre Voss
Valid until 12 Sep 2026
Estimator Andre Voss
Quotation to
Woodside Energy
Alicia Trent
alicia.trent@woodside.com
Perth WA
ABN 55 004 898 962
alicia.trent@woodside.com
Perth WA
ABN 55 004 898 962
Scope
NWS seawater exchanger — Cu-Ni retube, 3 off
Design code AS 1210 Cl 1
Material Cu-Ni 90/10
Payment terms 45 EOM
Material Cu-Ni 90/10
Payment terms 45 EOM
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Design, drafting & AS 1210 calculations | 1 | $15,448.00 | $15,448.00 |
| Manufacturing — 778 h | 778.0 | $135.00 | $105,030.00 |
| Testing, NDE & documentation — 99 h | 99.0 | $145.00 | $14,355.00 |
| Material, bought-in items & outside processes | 1 | $208,768.00 | $208,768.00 |
Subtotal ex GST$343,601.00
GST 10%$34,360.10
Total inc GST$377,961.10
Terms. Price firm to 12 Sep 2026 and subject to
material availability at the time of order. Design, fabrication, inspection and testing to AS 1210 Cl 1.
A manufacturer's data report is supplied on completion, including material certificates, welding procedures
and welder qualifications, NDE reports, heat treatment records and the hydrostatic test certificate.
Third-party inspection where the class requires it. Delivery ex works Dandenong South unless agreed
otherwise. All work carried out under our ISO 9001 · LRQA quality system.
Tube on 82-day lead from Sandvik. Price held 30 days only.
Build-up
Internal — not on the document the customer sees
Manufacturing
778.0 h
Direct
Testing
99.0 h
Direct
Material cost
$186,400
Total cost
$269,715
Sell ex GST
$343,601
Gross margin
$73,886
Tube on 82-day lead from Sandvik. Price held 30 days only.
Labour is costed at the blended shop rate and sold at the charge rate. Because the quote is built in the same
two buckets the shop books to, the variance on the job page is a straight comparison.