Q-26-0161 Demo Digester HX bundle — second unit
ISO 9001 · LRQA Sun 9 Aug 2026
Q-26-0161 Draft

Digester HX bundle — second unit · Melbourne Water · valid until 21 Sep 2026

Accepting this quotation opens a job on the next JN number and carries the 166.0 h manufacturing and 22.0 h testing straight across as the quoted hours. Nothing is re-keyed and nothing is re-estimated.
britannia:jahco
engineered for safety · built for pressure
Britannia Jahco Australia Pty Ltd
18 Healey Road, Dandenong South VIC 3175
ABN 13 141 068 171 · +61 3 9580 5599
ISO 9001 · LRQA
QUOTATION
Q-26-0161
Issued 7 Aug 2026
Valid until 21 Sep 2026
Estimator Sunil Patel
Quotation to
Melbourne Water
Sarah Whitcombe
s.whitcombe@melbournewater.com.au
Melbourne VIC
ABN 81 945 386 953
Scope
Digester HX bundle — second unit
Design code AS 1210 Cl 2B
Material SS316L
Payment terms 30 days

DescriptionQtyRateAmount
Design, drafting & AS 1210 calculations 1 $3,260.02 $3,260.02
Manufacturing — 166 h 166.0 $135.00 $22,410.00
Testing, NDE & documentation — 22 h 22.0 $145.00 $3,190.00
Material, bought-in items & outside processes 1 $13,760.32 $13,760.32
Subtotal ex GST$42,620.34
GST 10%$4,262.03
Total inc GST$46,882.37

Terms. Price firm to 21 Sep 2026 and subject to material availability at the time of order. Design, fabrication, inspection and testing to AS 1210 Cl 2B. A manufacturer's data report is supplied on completion, including material certificates, welding procedures and welder qualifications, NDE reports, heat treatment records and the hydrostatic test certificate. Third-party inspection where the class requires it. Delivery ex works Dandenong South unless agreed otherwise. All work carried out under our ISO 9001 · LRQA quality system. Waiting on tube count from site measure.
Build-up
Internal — not on the document the customer sees
29.3% margin
Manufacturing
166.0 h
Direct
Testing
22.0 h
Direct
Material cost
$12,286
Total cost
$30,146
Sell ex GST
$42,620
Gross margin
$12,474

Waiting on tube count from site measure.

Labour is costed at the blended shop rate and sold at the charge rate. Because the quote is built in the same two buckets the shop books to, the variance on the job page is a straight comparison.