NCR-2026-030 Awaiting disposition Supplier Return to supplier
Tube bundle — 6 tubes outside OD tolerance
What was found
Six tubes from the 640 m parcel measure 19.22–19.31 OD against 19.05 +0.10. Will not pass through the tubesheet drilling without forcing.
Raised by Marcus Keane, Workshop Manager, on 4 Aug 2026 .
Detail
- Job
- JN 174327
- Customer
- Orica Australia
- Source
- Supplier
- Supplier
- Sandvik Materials Technology
- Cause
- Supplier — material out of spec
- Disposition
- Return to supplier
- Rework
- 3.5 h
- Cost
- $244
Rework hours are booked to the Rework category, which is indirect. They name this job so
the cost is attributable, and they never touch the job's quoted manufacturing or testing hours.
Others with the same cause
Supplier — material out of spec
| NCR | Raised | Job | Rework | Cost | Status |
|---|---|---|---|---|---|
| NCR-2026-019Dished ends out of form tolerance on delivery | 14 May 2026 | JN 174258 | — | — | Closed |