QUOTATION
Q-26-0142
Issued 6 Jul 2026
Valid until 20 Aug 2026
Estimator Andre Voss
Valid until 20 Aug 2026
Estimator Andre Voss
Quotation to
Hydrogen Renewables Australia
Elena Marchetti
e.marchetti@h2ra.com.au
Perth WA
ABN 39 634 719 052
e.marchetti@h2ra.com.au
Perth WA
ABN 39 634 719 052
Scope
Hydrogen separator skid — 2 off
Design code AS 1210 Cl 1
Material Duplex 2205
Payment terms 30 days
Material Duplex 2205
Payment terms 30 days
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Design, drafting & AS 1210 calculations | 1 | $7,690.60 | $7,690.60 |
| Manufacturing — 1408 h | 1,408.0 | $135.00 | $190,080.00 |
| Testing, NDE & documentation — 154 h | 154.0 | $145.00 | $22,330.00 |
| Material, bought-in items & outside processes | 1 | $84,649.60 | $84,649.60 |
Subtotal ex GST$304,750.20
GST 10%$30,475.02
Total inc GST$335,225.22
Terms. Price firm to 20 Aug 2026 and subject to
material availability at the time of order. Design, fabrication, inspection and testing to AS 1210 Cl 1.
A manufacturer's data report is supplied on completion, including material certificates, welding procedures
and welder qualifications, NDE reports, heat treatment records and the hydrostatic test certificate.
Third-party inspection where the class requires it. Delivery ex works Dandenong South unless agreed
otherwise. All work carried out under our ISO 9001 · LRQA quality system.
First duplex job. Welder quals to be extended before fit-up.
Build-up
Internal — not on the document the customer sees
Manufacturing
1,408.0 h
Direct
Testing
154.0 h
Direct
Material cost
$75,580
Total cost
$223,970
Sell ex GST
$304,750
Gross margin
$80,780
First duplex job. Welder quals to be extended before fit-up.
Labour is costed at the blended shop rate and sold at the charge rate. Because the quote is built in the same
two buckets the shop books to, the variance on the job page is a straight comparison.